2025q4
2025q4

Q4 2025

Q4 2025

Foundation in place, BridgTime core ready

Foundation in place, BridgTime core ready

Q4 2025, Internal validation and readiness


Product and Execution
  • Prepare RVA schema v1 draft, provide sandbox preview for internal testing

  • Deliver oracle m of n mockup for non production rehearsal, issue and verify and log

  • Kick off external audit for AttestationRegistry and AccessController, report will not be public at this stage


Token and Governance
  • Verify explorer metadata and socials, publish a summary of admin rights and timelock policy

  • Document treasury and multisig signer policy for internal review


Data and Reliability
  • Define STRIDE threat model and role matrix, draft upgrade policy with timelock and multisig

  • Complete DPIA draft and data retention and deletion policy, prepare jurisdiction notices

  • Enable observability pipeline with logs and metrics and traces and alert rules


Targets
  • Scenario coverage 30 plus cases, no breaking change across three schema iterations

  • Failover rehearsal passed once, test RTO 30 minutes met

  • Lab latency, issue p95 under 1.0 seconds, commit batch 10 to 60 seconds, non production

  • Governance readiness, timelock minimum 24 hours, multisig 2 of 3 baseline


This is an internal validation phase, sandbox and performance numbers are measured in lab conditions and are not for production use.